Projects | Local authorities
Croxley Green: installation of steps
The site
A woodland footpath leading to the Grand Union Canal near Croxley Common Moor (LNR & SSSI).
The brief
To dismantle and dispose of the existing steps and grade the soil to hide the original line, then construct a flight of steps on a new, more gradual line.
The solution
We custom built and installed approximately 30 metres of steps with a connecting boardwalk section leading into a short section of timber edged granite path at the bottom.
The result
Alleviated the council's Health & Saftey concerns over existing dangerous steps by providing a long lasting and usable solution, making this busy path safer and more user friendly.

